Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

After doing the Calendar Post Deployment Configuration below, set up the Calendar on the Asset Location/Resource record page.

Go to the Asset Resource Record Page > Create a new Calendar tab > Drag and drop the Single Calendar Component.

Click Save.

After saving, you can now view the Calendar Component under the Asset layout.

Calendar Start and End Time on Asset

Calendar Start and End Time on Asset is now based on the Primary Education Institute.

When viewing the Calendar LWC on an Asset record,

  • If the Asset's Account has a Default Timetable Structure with a Day Start populated, then the Calendar LWC Start Time will also be set to the Day Start.

  • If the Asset's account does not have a Default Timetable Structure for Day Start, then the Calendar LWC Start Time will be set to the PosiEd Settings' Calendar Start Hour.

  • If the Asset's account has a Default Timetable Structure set for Day End, then the Calendar LWC End Time will match the Day End. This means that the end time for the Calendar LWC will be the same as the specified Day End.

  • If the Asset's Account does not have a Default Timetable Structure for the Day End, then the Calendar LWC End Time will be set equal to the PosiEd Settings' Calendar End Hour.

  • No labels