Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Current »

After doing the Calendar Post Deployment Configuration below, set up the Calendar on the Day Attendance record page.

Go to the Day Attendance Record Page > update the Template = Header and Right Sidebar > Search the PosiEd Calendar Component 6.1.11 > Drag and drop the PosiEd Calendar Component 6.1.11 in the right side of the Information Details section.

image-20240326-053809.png

Click Save.

After saving, you can view the Calendar Component under the Day Attendance layout.

image-20240326-053908.png

Calendar Start and End Time on Day Attendance

  • When viewing the Calendar LWC on a Day Attendance record,

    • If the Day Attendance’s Contact → Primary Educational Institution → Default Timetable Structure → Day Start is populated, then Calendar LWC Start Time will be equal to the Day Start.

    • If the Day Attendance’s Contact → Primary Educational Institution → Default Timetable Structure → Day Start is empty, then Calendar LWC Start Time will be equal to the PosiEd Settings' Calendar Start Hour.

    • If the Day Attendance’s Contact → Primary Educational Institution → Default Timetable Structure → Day End is populated, then Calendar LWC End Time will be equal to the Day End.

    • If the Day Attendance’s Contact → Primary Educational Institution → Default Timetable Structure → Day End is empty, then Calendar LWC End Time will be equal to the PosiEd Settings' Calendar End Hour.

  • No labels