/
Day Attendance - Calendar Component
  • Ready for review
  • Day Attendance - Calendar Component

    Go to the Day Attendance Record Page > update the Template = Header and Right Sidebar > Search the PosiEd Calendar Component 6.1.11 > Drag and drop the PosiEd Calendar Component 6.1.11 in the right side of the Information Details section.

    image-20240326-053809.png

    Click Save.

    After saving, you can view the Calendar Component under the Day Attendance layout.

    image-20240326-053908.png

    Calendar Start and End Time on Day Attendance

    • When viewing the Calendar LWC on a Day Attendance record,

      • If the Day Attendance’s Contact → Primary Educational Institution → Default Timetable Structure → Day Start is populated, then Calendar LWC Start Time will be equal to the Day Start.

      • If the Day Attendance’s Contact → Primary Educational Institution → Default Timetable Structure → Day Start is empty, then Calendar LWC Start Time will be equal to the PosiEd Settings' Calendar Start Hour.

      • If the Day Attendance’s Contact → Primary Educational Institution → Default Timetable Structure → Day End is populated, then Calendar LWC End Time will be equal to the Day End.

      • If the Day Attendance’s Contact → Primary Educational Institution → Default Timetable Structure → Day End is empty, then Calendar LWC End Time will be equal to the PosiEd Settings' Calendar End Hour.

     

    Related content

    Student/Staff/Carer (Person Account)
    Student/Staff/Carer (Person Account)
    More like this
    Asset Location/Resource - Calendar Component
    Asset Location/Resource - Calendar Component
    More like this
    Multi-Calendar View
    Multi-Calendar View
    More like this
    Cohort - Calendar Component
    Cohort - Calendar Component
    Read with this
    Absence Submission - Calendar Component
    Absence Submission - Calendar Component
    Read with this
    Calendar Component - PosiEd
    Calendar Component - PosiEd
    Read with this